The first of the fittings lineup that Cobra
Engineeirng is going to be making.
This presses in the back of the water pump in the block.
Now if you want to run a -8 AN line instead of the hard steel tube you
can.
Knock the old one out. Clean the bore well and push this one in
with the
supplied press fit loctite.
This is made from aluminum and will press better if froze first.
Make sure the surface is clean and dry before useing Loctite.
|
$65
Loctite included.
Free Shipping in the US
|